Implementation Vision — Proven Methodology.

Step 1 · Template
1
Template development & kick-off
Define standard templates, configure Ultimo, align scope and planning.
Step 2 · Site roll-out
2
Asset structure
Set up the asset hierarchy, locations and classification. Import or build registers.
Step 3 · Site roll-out
3
Maintenance processes
Work order flows, approval, scheduling rules, integration with business systems.
Step 4 · Site roll-out
4
Preventive maintenance plans
PM strategies based on criticality, regulations and manufacturer guidelines.
Step 5 · Site roll-out
5
Warehouse & spare parts
Warehouse setup, spare-parts catalogs, min/max stock, supplier links.
Step 6 · Site roll-out
6
Training & go live
End-user training, super-user coaching, go-live support and hypercare.
Step 1 · Template
Steps 2–6 · Site roll-out
Ultimo Configuration
0.5 – 1.0 × ARR
The more process flows and integrations, the higher the factor. A basic setup with standard workflows sits at 0.5×; complex multi-site configurations with deep ERP integrations move toward 1.0×.
Asset & Maintenance Data
0.5 – 1.5 × ARR
Depends on current data maturity. Well-structured data in an existing system (migration) keeps the factor low. Data in Excel or requiring as-built surveys raises it. Same applies to maintenance plans — structured migrations beat building from scratch.